Week 3 Preparing 1st floor for pouring compression slab
This week was a cold week with both day and night temperatures below zero.
This meant the pouring of the compression slab had to be postponed.
All preparations have now been made and we hope to start pouring on Monday in week 6.
The brickwork for the facing will also be slightly postponed.
The facing bricks are ready, as you can see in the pictures.